INSTALLATION CHECK LIST
NOTE 1: PROVIDE ADEQUATE DRIP LEG AND TRAP TO KEP STEAM SUPPLY LINE FREE OF
CONDENSATE.
NOTE 2: INSTALL SAFETY VALVE AT THIS CONNECTION WHEN STEAM SUPPLY PRESSURE MAY
EXCEED 75 PSIG FOR DUCTILE IRON EXCHANGERS AND 150 PSIG FOR CAST STEEL
EXCHANGERS.
NOTE 3: INSTALL SMALL TRAP AND STRAINER TO DRAIN CONDENSATION DURING NO LOAD OR
STANDBY CONDITION.
NOTE 4: INSTALL THERMONETER SUPPLIED ON OUTLET HOT WATER LINE.
NOTE 5: INSTALL STOP VALVES ON STEAM CONDENSATE AND WATER INLET AND OUTLET
LINES.
NOTE 6: SEE TABLE BELOW FOR MAXIMUM ELEVATION OF CONDENSATE DISCHARGE.
MAXIMUM ELEVATION TABLE
INLET PRESSURE (PSIG) MAXIMUM ELEVATION OF CONDENSATE DISCHARGE
2-4 0 ft 0 cm
5-6 2 ft 61.0 cm
7-8 4 ft 121.9 cm
9-10 6 ft 182.9 cm