Owner manual
CFTIIP-015
Rev.0
__________________________________________________________________________________
This document is the property of Circor Flow Technologies India Pvt Limited should not copied or
reproduced in one form or another.
Page 1 of 15
INSTALLATION, OPERATING
AND MAINTENANCE INSTRUCTIONS
D SERIES
TABLE OF CONTENTS
GENERAL INFORMATION
TERMS CONCERNING SAFETY
UNPACKING
INSTALLATIONS
VALVE MAINTENANCE
VALVE DISASSEMBLY AND REASSEMBLY
PLUG STEM PINNING
ILLUSTRATION INDEX
Figure 1 – Typical bolting torque sequence
Figure 2 – Exploded drawing
Figure 3 – Installation of carbon filled energized seal ring
Figure 4 – Installation of Grafoil seal ring
Figure 4.1 – Grafoil seal ring
Figure 5 – Plug stem pinning
Figure 5.1 – Plug
Figure 6 – End to End dimensions
Figure 7 – Trim types
Figure 7.1 – Single stage Balanced Trim
Figure 7.2 – Two stage Balanced Trim
Figure 7.3 – Standard Trim