Install Instructions

VALVE #1
CIRCULATOR
COLD
SUPPLY
HIGH TEMPERATURE RETURN
C
(FULL RETURN
WITH CHECK
RETURN LINE
CIRCULATOR
TEMPERED
SOURCE
WATER
HOT
WITH CHECK VALVE
BALANCING VALVE #2
BALANCING
VALVE
CHECK
TRAP
HEAT
RETURN
TEMPERED
LINE SIZE)
TEMPERED FIXTURES
AQUASTAT
C
T
BALL VALVE FOR
SETUP (OPTIONAL)
VALVE
CHECK
VALVE
ISOLATION
HIGH TEMPERATURE FIXTURES (IF APPLICABLE)
(SEE NOTE BELOW)
MIN 24"
IN AFTER RETURN
MUST BE TIED
THERMOMETER
LINE TIE IN
LEONARD
4
METHOD #5
PROCEDURE TO BALANCE
1. MAKE SURE NO WATER IS BEING DRAWN IN THE BUILDING. OPEN BALANCING VALVE #1
APPROXIMATELY HALF WAY AND START CIRCULATOR. KEEP BALANCE VALVE #2 CLOSED
AT THIS TIME.
2. OBSERVE TEMPERATURE UNTIL IT STABILIZES.
3. CLOSE BALANCING VALVE #1 SLIGHTLY IF TEMPERATURE IS TOO HOT, OR OPEN IT
SLIGHTLY IF TEMPERATURE IS TOO COLD. ALLOW TEMPERATURE TO STABILIZE, REPEAT
UNTIL DESIRED CIRCULATION TEMPERATURE IS SET.
4. IF UNABLE TO REACH DESIRED TEMPERATURE WITH VALVE #1 IN THE FULL OPEN
POSITION, OPEN BALANCE VALVE #2 IN SMALL INCREMENTS (i.e. 1/8, ΒΌ, 3/8, ETC) UNTIL
DESIRED TEMPERATURE IS ACHIEVED.
NOTE:
FOR MULTIPLE TEMPERED LOOPS, A BALANCING VALVE AND CHECK
VALVE MUST BE INSTALLED ON EACH LOOP AFTER TEMPERED FIXTURES