Daim Ntawv Qhia Tus Neeg Siv

Table Of Contents
Air-Source Unitary Heat Pumps
5
C. Packing, Shipping, Handling and Delivery:
1. Deliver materials in manufacturer’s original, unopened, undamaged containers with
identification labels intact
2. Ship, handle and unload units according to manufacturer’s instructions
D. Storage and Protection:
1. Store materials protected from exposure to harmful weather conditions
2. Factory shipping covers to remain in place until installation
Specifier Note: Include or remove following section as project dictates.
E. Waste Management and Disposal:
Specifier Note: ENVIRONMENT: The disposal of packaging waste into landfill site demonstrates an
inefficient use of natural resources and consumes valuable landfill space.
1. Separate waste materials for [Reuse] [And] [Recycling] [_____] in accordance with
Section [01 74 19 - Construction Waste Management and Disposal] [_____].
2. Remove from site and dispose of packaging materials at appropriate recycling facilities.
3. Collect and separate for disposal [Paper] [Plastic] [Polystyrene] [Corrugated cardboard]
[_____] packaging material [In appropriate onsite bins] [_____] for recycling.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 01 Closeout
Submittals (Warranty).
1.8 WARRANTY
A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions
B. Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard
warranty document executed by authorized company official. Manufacturer’s warranty is in
addition to, and not a limitation of, other rights Owner may have under Contract Documents.
Specifier Note: Coordinate paragraph below with manufacturer’s warranty requirements.
C. Warranty: Commencing on Date of Installation
1. Compressor: 5 years (limited)
2. Other Covered Components: 1 year (limited)
PART 2 - PRODUCTS
Specifier Note: Retain article below for proprietary method specification. Add product attributes,
performance characteristics, material standards and descriptions as applicable. Use of such phrases as
“or equal” or “or approved equal” or similar phrases may cause ambiguity in specifications. Such phrases
require verification (procedural, legal and regulatory) and assignment of responsibility for determining