f. Detailed composite wiring diagrams for control systems showing factory installed
wiring and equipment on split systems or required for controlling devices or
ancillaries, accessories, controllers.
D. Quality Assurance:
1. Test Reports: Certified test reports showing compliance with specified performance
characteristics and physical properties
2. Certificates: Product certificates signed by manufacturer certifying materials comply with
specified performance characteristics and criteria and physical requirements
3. Manufacturer’s Instructions: Manufacturer’s installation instructions
Specifier Note: Coordinate paragraph below with Part 3 Field Quality Requirements Article. Retain or
delete as applicable.
E. Manufacturer’s Field Reports: Manufacturer’s field reports specified
F. Closeout Submittals: Submit the following:
1. Warranty: Warranty documents specified
2. Operation and Maintenance Data: Operation and maintenance data for installed
products in accordance with Division 1 Closeout Submittals (Maintenance Data and
Operation Data) Section. Include methods for maintaining installed products and
precautions against cleaning materials and methods detrimental to finishes and
performance. Include names and addresses of spare part suppliers.
3. Provide brief description of unit, with details of function, operation, control and
component service
4. Commissioning Report: Submit commissioning reports, report forms and schematics in
accordance with Section [01 91 00 - Commissioning]
1.6 QUALITY ASSURANCE
A. Qualifications:
1. Installer experienced in performing work of this section who has specialized in
installation of work similar to that required for this project
2. Manufacturer Qualifications: Manufacturer capable of providing field service
representation during construction and approving application method
B. Preinstallation Meetings: Conduct preinstallation meeting to verify project requirements,
manufacturer’s installation instructions and manufacturer’s warranty requirements. Comply
with Division 1 Project Management and Coordination (Project Meetings).
1.7 DELIVERY, STORAGE & HANDLING
A. General: Comply with Section [01 61 00 - Common Product Requirements]
B. Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to
avoid construction delays