Install Manual

Table Of Contents
Leidos Proprietary
IP, ProVision2 to ProVision3
System Upgrade
8000-35512-IP
Rev A1
Leidos Security Detection & Automation, Inc. – Proprietary Page 9 of 26
Figure 9 – 48V Connections
7.6.7 Double check that all electrical connections are tight and correct.
7.6.8 Remove two of the cable ties from the old power supply and attach with existing screws to the
new power supply. Use cable ties to dress cables in the electrical enclosure.
Figure 10 – Dress Cables
-48V
+48V