Install Manual

Table Of Contents
Leidos Proprietary
IP, ProVision2 to ProVision3
System Upgrade
8000-35512-IP
Rev A1
Leidos Security Detection & Automation, Inc. – Proprietary Page 7 of 26
Figure 6 – Insert AC Cables to Power Distribution Block
7.6.3 Attach both ground cables [1200-32102-00] to the ground lug.
Figure 7 – Attach Ground Cables to Grounding Stud
7.6.4 Plug the 24VDC cable [1200-32104-00] from the Power Supply Assembly into J26 on the Power
Distribution Board.