Install Manual

Table Of Contents
Leidos Proprietary
IP, ProVision2 to ProVision3
System Upgrade
8000-35512-IP
Rev A1
Leidos Security Detection & Automation, Inc. – Proprietary Page 5 of 26
Figure 4 – Disconnect Ground Cable
7.6. Install New Power Supply
7.6.1 Slide new power supply assembly into electrical enclosure and re-install the four screws removed
in step 7.5.1 to attach the power supply bracket to the electrical enclosure.