Install Manual

Table Of Contents
Leidos Proprietary
IP, ProVision2 to ProVision3
System Upgrade
8000-35512-IP
Rev A1
Leidos Security Detection & Automation, Inc. – Proprietary Page 20 of
26
Figure 26 – V3ISU Installation: Step 6
7.11.7 On the rear of the ISU, push the retention bracket against the unit by applying pressure to the
ends while tightening the screw as shown in Figure 27.
Figure 27 – V3ISU Installation: Step 7
7.11.8 Snap fit a ferrite core P/N 0375-35639-00 on each individual cable (10X) and position them
toward the cable retention bracket as shown in Figure 10. Once this has been completed the ISU
tray can be rotated to the closed position and secured. NOTE: Installation of ferrite cores are
required on one mast only.
(Front of ISU)
Position unit
from this end