Leidos Security Detection & Automation, Inc. – Proprietary Page 17 of
26
Figure 21 – Mast Cable Routing
7.10.3 Repeat the same steps to replace the second mast.
7.10.4 Refer to the Provision 2 Maintenance Manual 8100-20602-TM. (Section 7.6 Component
Replacement Procedure) to reinstall components removed for mast accessibility.
7.11. ISU Replacement
7.11.1 Refer to the Provision 2 Maintenance Manual 8100-20602-TM (Section 7.6 Component
Replacement Procedure) for ISU removal and replacement.
7.11.2 Remove the V2ISU from the system. Place the V3ISU in the mounting tray and loosely install a
single mounting screw in the hole furthest from the mast cabling connections as shown in Figure 22.
Apply a few turns only.
Figure 22 – V3ISU Installation: Step 2
7.11.3 Plug the mast cables in by identifying the marking on each cable with the port markings on the
enclosure.
Start screw
this location
Mast
Cabling