7.10. Mast Replacement
7.10.1 Disconnect the mast cabling from the ISU. Remove the five bolts securing the mast to the swing
arm and be sure to save the hardware for reuse. Install the PV3 mast [1000-30230-00] using the center
bolt only leaving it loose to allow mast rotation. Remove the protective film from both sides of cosmetic
mast wrap [3000-32879-00] and wipe down with ESD wipes [490-26003]. Install the cosmetic wrap using
the push rivets [410-21034] provided with the upgrade kit. After the cosmetic wrap has been installed,
rotate the mast into position and reinstall the remaining four bolts. Torque the four perimeter bolts to 54.2
Nm (40.0 ft-lb) in a cross pattern and torque the center bolt to 37.9 Nm (28.0 ft-lb).
7.10.2 Once the mast has been secured, dress the cabling as close as possible to the mast swing arm
using the cable clamp [0380-31093-00] provided with the upgrade kit to avoid contact with the radome as
shown in Figure 21.