Manual
34
Instructions for Use V 2.2 RevI – 08/2013
4. Initial Operation
Unpacking the instrument (continued)
Removing the transport anchors
• Afterinstallingthemonitor,youhavetoremovealltransport
anchors (adhesive tape and foam parts).
• First,carefullyremoveallbluestripsofadhesivetape(105)
that secure the doors and the drawer of the instrument.
105
Fig. 17
9
Fig. 18
• Intheretort,youalsohavetoremovethestripofadhesive
tape (105) that secures the cover of the level sensors
(Fig.19).
• Then,openthedrawer(9) and remove all foam parts there
(Fig.18). Also remove the six dark gray molded parts (106)
from the necks of the RTU-bottles.
Fig. 19
106
19
19
105
9
• Removetheadhesivetape(105) from the lid of the retort
(19) (Fig.17).
105