4. Initial Operation
4.1 Unpacking the instrument
• Bringthetransportcrate(80) in which the
instrument is packaged as close as possible to
the nal installation location.
• There,rstremovethestraps(82), then the
cover (81).
Fig. 5
84
80
81
82
83
82
Opening the package (Fig. 5)
1 m
1 m
1 m
3 m
ASP6025
Box
Front
Sucient surface area is required for unpacking the
instrument.
The distance to the nearest wall must be at least
1 m on the side and rear.
On the front, the distance must be at least 3 m,
as the ASP6025 is rolled from the pallet in this
direction.
The room height must be at least 2.5 m, as the
packaging must be removed by pulling it upwards.
Fig. 4
85
• Important!
• At least TWO persons are required when lifting or carrying the instrument.
• The packaging has two indicators (83, 84, Fig. 5) that indicate improper transport. When the instrument is
delivered, check this rst. If one of the indicators is colored red, the package was not handled as prescribed.
• In this case, please mark the shipping documents accordingly and check the shipment for damage!