User's Manual
Table Of Contents
13
3、Open the meter terminal cover, and adjust the height of hanger.
4、Using the vertical installation method, the meter is hanging on the hanger screw, and fixed on
the bottom by two screws. Need to ensure that the 3 screws are completely banned, and the
meter is installed firmly, without shaking.
To ensure the installation stability, the diameter of hanger screw must be greater
than 11mm, and the diameter of bottom fixed screws must be greater than 7mm.
5、Cut the cable to the required length and use the wire stripper to uncover the cable. The
recommended bare metal length after stripping is at least 20mm for this series of products.
We insist on the recommended length of the stripped wire to ensure that the
bare metal part is long enough and can be fixed by two connection screws at
the same time. However the bare part should not exceed the terminal box
wiring holes, ensure the safety and insulation effect.
6、When using a small sectional cable, such as 4mm squared, the cable must be placed in the
medium to ensure that the screw is well tightened without deviation.