Full Product Manual

SPARE
ROLL
PINS
The impeller
is
secured
to
the impeller shaft
with
roll pins.
Figure
15
6X37
X2
-=ยท
Two
6x37
roll
pins
for
impeller
are supplied
as
spare
in
the
hardware kit. Store them in a safe place until needed.
AUGER
BELT
REPLACEMENT
If
the auger belt becomes worn, oil-soaked,
or
otherwise damaged,
proceed
as
follows
to
replace the belt.
1.
To
prevent spillage drain all fluids, remove all fuel from tank
by running engine until
it
stops. Remove the key
to
avoid
unintended starting and allow
unit
to
cool completely.
2.
Remove the
two
screws
that
hold
the
belt cover in place and
set the cover aside.
(See
Figure
16a)
Figure16a
3.
Roll the auger belt
off
the engine pulley.
(See
Figure
16b)
Figure
16b
4. Carefully pivot the snow blower up and forward
so
that
it
rests
on the auger housing.
5.
Remove
the frame cover from the underside
of
the snow blower
by removing the screws which secure the cover.
(See
Fisure
16c)
Figure16c
6.
Release
the spring from the connecting hole in the braking
bracket. Move the braking bracket away from the belt. Remove
the belt
from
around
the
auger pulley, and slip
the
belt between
the support bracket and the auger pulley.
(See
Fisure
16d)
Figure16d
7.
Replace the auger belt by following instructions in reverse
order.
Service
I 20