INSTALLATION INSTRUCTIONS M1-1020 (MK2142) M1-1021 M1-1022 HAND SHOWER WITH BLACK HANDLE HAND SHOWER WITH METAL-FINISH HANDLE HAND SHOWER WITH WHITE HANDLE M1-1021 M1-1022 M1-1020 (MK2142)
What you need to know Tools: Maintenance Adjustable Wrench Groove Joint Pliers Hacksaw Phillips Screwdriver Pipe Tape Spatula Spirit Level Your new bathroom faucet is designed for years of trouble-free performance. Safety Tips Important Points If you are soldering during faucet installation, remove cartridges, seats, gaskets and washers prior to applying flame, otherwise you will void the warranty. Prior to beginning installation.
Step 1 Installation Procedure 4 1/8" (104.9mm) 8 1/4" (209.2mm) Ø3" (Ø76.5m m ) Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. Shut off main water supply before installation. Tighten the handshower to a shower hose (not included) by hand only. Please ensure that the wall outlet of any installation is placed high enough on the wall so that it cannot reach the floor if dropped when in use. 1/2-14NPSM 3 9/16" (90.
For additional assistance or service call 718-302-5292 9am to 5pm EST Monday to Friday www.lefroybrooks.com LEFROY BROOKS INC, 1828 TROUTMAN STREET, RIDGEWOOD, NY, 11385 TELEPHONE: 718-302-5292. FAX: 718-302-4177 The use of trademarks, product design and artwork is subject to licence or agreement with LBIP Ltd. The design registrations, trademark registrations and copyrights are protected by law and the use or reproduction outside the terms of an agreement is prohibited.