User Guide
46 | 127 © 2021 LeddarTech Inc.
Fig. 33: Clearance size (top view)
Fig. 33 shows the minimum opening recommended at the back of the sensor to evacuate heat properly.
Fig. 34: Clearance size (rear view)
Make sure to leave enough space for the connectors.
No interference
No interference
7 500 mm
2
minimum
opening
A = 7 500 mm
2
minimum opening