User's Manual
Table Of Contents
LBS7320 Outdoor LTE TDD Base Station User’s Manual
18
3.1 Document preparation
Before installation starts, make sure that you have learned and mastered the
information in the following documents.
Installation SmallCell, need to refer to the following documents:
《LBS7320 Hardware information》
3.2 Tools and meters preparation
The following tools and meters need to be prepared before installation.
Table 2-1 Support Materials for Installing Base Station
Level bar
Marking pen
Knife
Antistatic gloves
Wrench
Percussion drill
Rubber
hammer
Cross
screwdriver(M3)
Ladder
Tape measure
L-shape Inner
hexagon
spanner(M3\M4)
Wire stripper
Coaxial cable
clamp
Crystal head
clamp
Slanting
forceps
Fixed pulley
Rope
Torque
wrench(Opening
16mm、17mm、
21mm、32mm)
Torque
sleeve(M6\M10)
Torque
screwdriver(3m
m、5mm)