10.2.2 Base plate layout
TLT240SB symmetric installation is shown in Fig.9
:
With total width (A) as the basis, draw two parallel
lines (#1 and #2) on the concrete slab, with the error
within 3mm.
Determine the power side column location on any
chalk line, and mark the total width (B) of the base
plate. Mark the points 3 and 4.
Starting from point 3, draw one diagonal line (C),
forming a triangle. In this way, the vertical lines can
determine the location of the two columns.
B
5
2
0
m
m
(
2
0
.
5
in)
2
3
5
m
m
(
9
.
3
i
n
)
1#
C
对
角
线
3
4
1
0
m
m
(
1
3
4
.
3
i
n
)
φ
2
2
m
m
(
0
.
9
i
n
)
4
3
2#
A
2610mm(102.8in)
2770mm(109.1in)
3370mm(132.7in)
2
3
5
m
m
(
9
.
3
i
n
)
380mm
(15in)
25mm(1in)
Fig.9
Note:
All the dimensions are based on the external
border of the base plate.
Ensure the overall error is controlled within 6mm.
In this way, the difficulties in the final assembly,
or early wear or non-alignment of the chain can
be eliminated. The marking and layout is very
important. If it is inaccurate, there will be
problems during the final assembly and
operation.
10.2.3
Install the power side column
For floor-plate two post lift, use lifting equipment to
place power side column upper right to the location.
Align the base plate of column with the chalk line
layout. Guided by holes on the base plate of the
column, used 5 concrete anchor bolts to fix it onto the
ground. Drill and install anchor bolts at one time, during
the drilling process, ensure no movement of the
column. (Fig.11).
Diagonal 3410mm (134.3in)