Installation Guide
10 
INSTALLATION    INSTRUCTIONS 
When the lift arrives on site: 
 
Read the owner’s manual and make sure the installation instructions are 
fully understood. 
 
Check for any freight damages.
 The shipment should be thoroughly 
inspected as soon as it is received. The signed bill of lading is 
acknowledgement by the carrier of receipt in good condition of shipment 
covered by our invoice .If any of the goods called for on your bill of lading 
are shorted or damaged, do not accept them until the carrier makes a 
notation on the freight bill of the missing or damaged goods. Do this for 
your own protection. Check the contents of the accessory and hardware 
boxes to make sure no parts are missing. 
NOTE:
 IT IS DIFFICULT TO COLLECT FOR LOSS OR DAMAGE AFTER 
YOU HAVE GIVEN THE CARRIER A CLEAR RECEIPT. THE LIFT 
MANUFACTURER IS NOT RESPONSIBLE FOR ANY FREIGHT DAMAGE. 
UNPACKING PROCEDURE 
Important! Place the main structural components on wooden blocks so 
that the steel shipping frames can be removed. 
Remove Power Unit Box. 
Remove the plastic wrapping. 
Remove the cross member, and the actuator bar. 
Remove the arms and parts boxes 
Unbolt the steel shipping frames. 
Lay each tower on the floor with the carriage side up. 
Check the installation area for obstructions. (Lights, Heating Ducts, 
Ceiling, Floor Drains, etc.)










