IMPORTANT: Turn off the power at the main fuse or circuit beaker box before starting installation Locate all hardware & components before discarding packaging 1 Run wire through center stein and attach to the body of the fin tore, 2 7. to stall 8 max 25W (39 bulbs. 8. Thread glass onto cup. 2. Remove mounting bracket from fixture and install to electrical box. . Attach appropriate amount of chain to Loop on center stent fo achieve desired moaning height, Thread wire through every 3rd Loop of chs .