Installation & Assembly
1of2
(1)MediumBase100WMaximum,Alternatebulb(1)13WCFL
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
Hardware Contents
AA
Crossbar Assembly
x1
A
B
B
C
C
D
Supply
Wires and
Ground Wire
STEP 2 Install Crossbar Assembly-
A. Pass the supply wires through the Crossbar
Assembly (AA). Attach the Crossbar
Assembly (AA) to the Outlet Box with the
head of the Green Ground Screw facing
you. Secure it with Outlet Box Screws (not
included). Tighten until snug.
Figure 1
STEP 1 Assemble Rods and the
Ceiling Canopy
-
A. Determine the Rods (B/C) to be
assembled to the (D)
according to your hanging height.
Socket Assembly
B. Pass the supply wires and ground wire
through the chosen rods (B/C) and the
Ceiling Canopy (A). Thread the Socket
Assembly (D), the chosen Rods (B/C)
STEP 3 Fit Ceiling Canopy to
Crossbar Assembly
-
A.
Ceiling Canopy A to the
Ceiling Canopy A
ceiling
Remove mounting balls from the
Crossbar Assembly (AA). Fit the
()
Crossbar Assembly (AA) and
secure with mounting balls. Note:
The ( ) should be
snug against the and the
mounting balls. If Not, adjust the
length of the nipple on the Crossbar Assembly (AA) by unscrewing
the preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (A) is secure, remove the
mounting ball and Ceiling Canopy (A) and proceed to Step 4.
Package Contents
B
6” Rod
x2
A
Ceiling Canopy
x1
C
12” Rod
x2
D
Shade
x1
E
Socket
Assembly
x1
Mounting Screw
Hex Nut and
Lock Washer
A
AA
Mounting Ball
STEP 4 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. (Connectors are not included with fixture.) Twist
connectors until wires are tightly joined together. Wrap each
connection with approved electrical tape and carefully stuff all the
connected wires into the Outlet Box.
White wire
from fixture
Black wire
from fixture
Ground wire
from fixture
White wire
from supply
Black wire from
supply (or Red)
Ground wire
from supply
Supply Wires
with Ground Wire
AA
Outlet Box Screws
(not included)
Outlet
Box
and the Ceiling Canopy
(A) together. Hand
tighten until snug.
Suggested rods for
Ceiling height :
8’ ceiling : use (2) 6” rod
9’ ceiling : use (2) 6” rod
and (1) 12” rods
Figure 2
Figure 3
Figure 4
Mounting
Screw
A
AA
Mounting Ball
STEP 5 Install Fixture Body-
A. Carefully tuck all wires into the
outlet box and position the Ceiling
Canopy (A) over the outlet box.
Align the holes in the Ceiling
Canopy (A) with the mounting
screws, then attach the Ceiling
Figure 5
ToolsRequired:Flatheadscrewdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
LightSource:
EstimatedAssembly Time:
Preparation:
Assembly Instruction