Installation Guide
INSPIrE INSTALLATION INSTRUCTIONS PAGE 4
INSTALLING HANDLES (optional)
The screen comes with two metal G-Handles that can be positioned and
installed on the pull bar of the A-Screen Cassette. Locate the 3/8” wide
vertical slot down the center of the A-Screen Cassette Pull Bar. Measure up
37” from the bottom of the A-Screen Cassette and center the G-Handle
at that mark. The handle may be placed higher or lower if desired. There are
two parts for the G-Handle. Gb-Handle Base has two screw holes, with an
elevated second flange. The bottom part of this piece fits into the 3/8" vertical
slot on the A-Screen Cassette Pull Bar. Position as desired and attach using
H-#8 x ½”(12mm) Phillips Flathead Self-starting Screws. DO NOT
PRE-DRILL holes or you may critically damage components that are located
inside the A-Screen Cassette Pull Bar. NOTE: Make sure that the arch of
the G-Handle points toward the door end (see illustration at left).
Next, slide the Ga-Handle on to the elevated flange of the Gb-Handle Base.
It will fit securely over the base. There is a hex-screw pre-installed in
Ga-Handle. When properly aligned over Gb-Handle Base, tighten to
secure Ga-Handle to the A-Screen Cassette Pull Bar.
APPENDIX A
MULTIPLE SCREEN PANEL SYSTEMS
Please note that all double panel and multiple panel Inspire screens use a full length magnetic seal (rather than pile weather
strip seal at the leading edge of the A-Screen Cassette pull bar). Panels can be rotated to operate left or right.
4.1 CENTER LATCHING DOUBLE PANEL SCREENS
Note that this configuration does not use a C-Side Profile but instead uses two A-Screen
Cassettes with one being installed at each side jamb of the door opening. Follow the
instructions beginning at Step 1. At Step 2.1 install three E-Recess Mount Brackets at
each side jamb where the cassettes will be located. During Step 2.3 take care to add
additional screws when installing the B-Top Guide Rail.
4.2 SIDE LATCHING DOUBLE PANEL SCREENS
Note that this configuration uses a C-Side Profile on one side of the
opening with two A-Screen Cassettes being installed at the opposite side
jamb. Follow step 1 and 2.1, 2.2 and 2.3 while being certain to add
additional screws to when installing the B-Top Guide Rail. Locate the
A-Screen Cassette that does NOT have the full length magnetic seal at
the leading edge of the pull bar. This will be the first screen panel to
install on the E-Recess Mount Brackets. Rotate the A-ScreenCassette so
that the open back edge aligns with the E-Recess Mount Brackets and snap the screen cassette to the brackets. Take the
A-Screen Cassette with the full length magnetic seal at the leading edge of the pull bar. Position the side without the magnet
so that it aligns with the first A-Screen Cassette and snap together the cassettes. Continue the installation at Step 2.5 and 3.
4
C
F
E
E
E
D
A
I
I
I
I
I
I
I
I
I
F
Gb
H
H
Ga
H
H
Gb
Ga
B
3/8’’ Vertical
Channel
Center
Handle 37’’
from Bottom
of Pull Bar