Installation Guide

ESCAPE 200 INSTALLATION INSTRUCTIONS PAGE 8
RECESS INSTALLATION
ADJUSTING THE TOP RETAINER GUIDE & HANDLES
Adjust the Q-Top Retainer Guide(s) so that they are positioned at the top of
the Pull Bar(s)
Allen-Head Set Screw. Adjust the G-Handle heights by loosening the
Allen-Head Set Screw, move the G-Handle as desired and retighten screw.
Note: the Retainer Guide(s) should NOT touch the Top Guide Rail when
positioned correctly.

A
A
B
T
S
R
Q
PULL BAR
V
V
S
T
B
11.1
U
PULL BAR
V
S
U
OPTIONAL
(APPLICABLE ONLY IF STEP FOUR WAS IMPLEMENTED)
Close the screen doors. Now, on the B-Bottom Guide Rail and the C-Top Guide
Rail, make pencil marks to the center of the channel in which you’ve installed the
Slide Bolts.
Center the T-Bottom Slide Bolt Retainer to your channel mark, with the
bottom of the Retainer flush to the bottom of the B-Bottom Guide Rail.
Pencil mark the position for the screws, set the Retainer
holes. Then attach the T-Bottom Slide Bolt RetainerV- #4 x 3/8”
Phillips Panhead Screws [10.1].
Position the U-Top Slide Bolt Retainer so that it also centers to the channel
mark, with the bottom of the Retainer flush with the bottom of the C-Top
Guide Rail. Pencil mark the position for the 4 screws, set aside the Retainer
U-Top Slide Bolt Retainer using
(4) V- #4 x 3/8” Phillips Panhead Screws [10.2].

11.2