Technical Specs
Table Of Contents
- Important Notice
- Safety and Hazards
- Limitation of Liability
- Contents
- List of Tables
- List of Figures
- 1: Introduction
- 2: Electrical Specifications
- 3: RF Specifications
- 4: Power
- 5: Software Interface
- 6: Mechanical and Environmental Specifica- tions
- 7: Regulatory Compliance and Industry Certifi- cations
- A: Antenna Specification
- B: Design Checklist
- C: Testing
- AT Command Entry Timing Requirement
- Acceptance Testing
- Certification Testing
- Production Testing
- Functional Production Test
- Quality Assurance Testing
- Suggested Testing Equipment
- Testing Assistance Provided by Lantronix, Inc.
- IOT/Operator Testing
- Extended AT Commands for Testing
- D: Packaging
- E: References
- F: Acronyms
Rev 5 May.21
66
41113694
C: Testing
Note: All AirPrime embedded modules are factory-tested to ensure they conform to published
product specifications.
Developers of OEM devices integrating Lantronix, Inc. AirPrime embedded modules
should include a series of test phases in their manufacturing process to make sure that
their devices work properly with the embedded modules.
Suggested phases include:
•
Acceptance Testing—Testing of modules when they are received from
Lantronix, Inc.
•
Certification Testing—Testing of completed devices to obtain required certifications
before beginning mass production
•
Production Testing—Testing of completed devices with the modules embedded
•
Quality
Assurance
Testing—Post-production
AT Command Entry Timing Requirement
Some AT commands require time to process before additional commands are entered.
For example, the modem will return “OK” when it receives
AT!DAFTMACT. However, if
AT!DARCONFIG is received too soon after this, the modem will return an error.
When building automated test scripts, ensure that sufficient delays are embedded where
necessary to avoid these errors.
Acceptance Testing
Note: Acceptance testing is typically performed for each shipment received.
When you receive a shipment from Lantronix, Inc., you should make sure it is suitable
before beginning production.
From a random sampling of units, test that:
•
Units are operational
•
Units are loaded with the correct firmware version
Acceptance Test Requirements
To perform the suggested tests, you require a test system in which to temporarily install
the module, and you must be able to observe the test device’s LED indicator.
C