User Manual
Table Of Contents
- 15-0160 - Exhibit Cover.pdf
- Perthshire Installation Manual 98-1135.pdf
- Chapter 1: Pre-Installation 7
- Chapter 2: American GPR Index Cover & GPR Install 23
- Chapter 3: Rockwell GPR Index Cover & GPR Install 39
- Chapter 4: Schlumberger GPR Index Cover & GPR Install 49
- Chapter 5: Sprague GPR Index Cover & GPR Install 61
- Chapter 6: Index Cover Pulser Install and Operation Start Up 77
- Chapter 7: Electronic Pulser Installation 83
- Appendix A: GPR Waterproofing 99
- Appendix B: Installation in Hazardous Locations 107
- Appendix C: American Kit Sub-Assemblies 111
- Appendix D: Rockwell Kit Sub-Assemblies 115
- Appendix E: Schlumberger Kit Sub-Assemblies 117
- Appendix F: Sprague Kit Sub-Assemblies 119
- Table 1-1. Typical Gas Meter Module Installation Tool List
- Table 1-2. American Meter Index Cover Mini Switch Kits
- Table 1-3. American Large Diaphragm Meter Dial Wheels
- Table 1-4. American GPR + Brackets Kits
- Table 1-5. Rockwell Large Diaphragm Meter GPR Index Cover Kit
- Table 1-6. Rockwell Large Diaphragm Meter GPR Dial Wheel
- Table 1-7. Rockwell Mounting Kit
- Table 1-8. Schlumberger Large Diaphragm Meter GPR Index Cover Kit
- Table 1-9. Schlumberger Large Diaphragm Meter GPR Back Mount Wheel
- Table 1-10. Schlumberger Mounting Kit
- Table 1-11. Sprague Large Diaphragm Meter GPR Kit
- Table 1-12. GPR Dial Wheels
- Table 1-13. Sprague Mounting Kit
- Table 1-14. Rotary Gas Meter Module Installation Tool List
- Table 1-15. GPR Rotary Meter Cables
- Table 1-16. GPR Installation Components for Rotary Gas Meters
- Table 1-17. GPR Pipe Mounting Hardware.
- Table 6 - 1. Single Form-C Volume Wiring Definitions
- Table 7 - 1. Definitions
- Table 7 - 2. Single Form-A Volume Input Definitions
- Table 7 - 3. Two Form-A Volume Inputs Wiring Definitions
- Table 7 - 4. Two Form-A and Alarm Wiring Definitions
- Table B - 1. Conforming Safety Parameters
- Table C - 1. Kit, GPR Installation, American Large Diaphragm, Alternative Orientation #45- 1189
- Table C - 2. Kit, GPR Installation, American Large Diaphragm, Behind Index #45-1190
- Table C - 3. Kit, American Large Diaphragm Alternative Orientation GPR, #45-1193
- Table C - 4. Hardware Kit, American Large Diaphragm #45-1203
- Table C - 5. GPR Assembly w/ Universal Bracket #45-1185
- Table C - 6. GPR Cover Mounting Kit #45-1042
- Table D - 1. GPR Installation Kit for Rockwell 750 Large Diaphragm Meter #45-1186
- Table D - 2. Kit, Rockwell Large Diaphragm Index Cover Hardware #45-1169
- Table D - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table E - 1. Schlumberger Large Diaphragm GPR Kit #45-1187
- Table E - 2. Kit, Schlumberger Large Diaphragm Index Cover Hardware # 45-1171
- Table E - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table F - 1. GPR Installation Kit for Sprague Large Diaphragm Meters #45-1188
- Table F - 2. Sprague Large Diaphragm Index Cover Hardware Kit #45-1114
- Table F - 3. GPR Assembly w/ Universal Bracket #45-1185

Landis+Gyr Chapter 6 - Index Cover Pulser Install and Operation Start Up
Installation Guide 98-1135 Rev AE 79
The connector on the cable is mated to the channel B on the GPR Sensor Connector as shown in the
figure below.
NOTE: Battery should not be connected until GPR is fully mounted.
Start the GPR Operation In Install Mode
By now, the GPR should be fully mounted without it's cover (Rockwell meter shown for reference):
Table 6 - 1. Single Form-C Volume Wiring Definitions
GPR Sensor Index Cover
GPR Sensor
Connector Pin #
Signal and Description Lead Color Terminal
Description
and notes
1 N/C N/A N/A Not Applicable
2 N/C N/A N/A Not Applicable
3 N/C N/A N/A Not Applicable
4 N/C N/A N/A Not Applicable
5 Ground Drain N/A Not Applicable
6
CHAN B NO, Channel B
normally open
Orange NO Normally Open
7
CHAN B COM, Channel
B common
WHITE/ORANGE COM Common
8 CHAN B NC Green NC Normally Closed
9
CHAN B TAMPER TEST,
channel B tamper test
WHITE/GREEN NO Tamper Test
10 N/C N/A N/A Not Applicable
11 N/C N/A N/A Not Applicable