User Manual
Table Of Contents
- 15-0160 - Exhibit Cover.pdf
- Perthshire Installation Manual 98-1135.pdf
- Chapter 1: Pre-Installation 7
- Chapter 2: American GPR Index Cover & GPR Install 23
- Chapter 3: Rockwell GPR Index Cover & GPR Install 39
- Chapter 4: Schlumberger GPR Index Cover & GPR Install 49
- Chapter 5: Sprague GPR Index Cover & GPR Install 61
- Chapter 6: Index Cover Pulser Install and Operation Start Up 77
- Chapter 7: Electronic Pulser Installation 83
- Appendix A: GPR Waterproofing 99
- Appendix B: Installation in Hazardous Locations 107
- Appendix C: American Kit Sub-Assemblies 111
- Appendix D: Rockwell Kit Sub-Assemblies 115
- Appendix E: Schlumberger Kit Sub-Assemblies 117
- Appendix F: Sprague Kit Sub-Assemblies 119
- Table 1-1. Typical Gas Meter Module Installation Tool List
- Table 1-2. American Meter Index Cover Mini Switch Kits
- Table 1-3. American Large Diaphragm Meter Dial Wheels
- Table 1-4. American GPR + Brackets Kits
- Table 1-5. Rockwell Large Diaphragm Meter GPR Index Cover Kit
- Table 1-6. Rockwell Large Diaphragm Meter GPR Dial Wheel
- Table 1-7. Rockwell Mounting Kit
- Table 1-8. Schlumberger Large Diaphragm Meter GPR Index Cover Kit
- Table 1-9. Schlumberger Large Diaphragm Meter GPR Back Mount Wheel
- Table 1-10. Schlumberger Mounting Kit
- Table 1-11. Sprague Large Diaphragm Meter GPR Kit
- Table 1-12. GPR Dial Wheels
- Table 1-13. Sprague Mounting Kit
- Table 1-14. Rotary Gas Meter Module Installation Tool List
- Table 1-15. GPR Rotary Meter Cables
- Table 1-16. GPR Installation Components for Rotary Gas Meters
- Table 1-17. GPR Pipe Mounting Hardware.
- Table 6 - 1. Single Form-C Volume Wiring Definitions
- Table 7 - 1. Definitions
- Table 7 - 2. Single Form-A Volume Input Definitions
- Table 7 - 3. Two Form-A Volume Inputs Wiring Definitions
- Table 7 - 4. Two Form-A and Alarm Wiring Definitions
- Table B - 1. Conforming Safety Parameters
- Table C - 1. Kit, GPR Installation, American Large Diaphragm, Alternative Orientation #45- 1189
- Table C - 2. Kit, GPR Installation, American Large Diaphragm, Behind Index #45-1190
- Table C - 3. Kit, American Large Diaphragm Alternative Orientation GPR, #45-1193
- Table C - 4. Hardware Kit, American Large Diaphragm #45-1203
- Table C - 5. GPR Assembly w/ Universal Bracket #45-1185
- Table C - 6. GPR Cover Mounting Kit #45-1042
- Table D - 1. GPR Installation Kit for Rockwell 750 Large Diaphragm Meter #45-1186
- Table D - 2. Kit, Rockwell Large Diaphragm Index Cover Hardware #45-1169
- Table D - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table E - 1. Schlumberger Large Diaphragm GPR Kit #45-1187
- Table E - 2. Kit, Schlumberger Large Diaphragm Index Cover Hardware # 45-1171
- Table E - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table F - 1. GPR Installation Kit for Sprague Large Diaphragm Meters #45-1188
- Table F - 2. Sprague Large Diaphragm Index Cover Hardware Kit #45-1114
- Table F - 3. GPR Assembly w/ Universal Bracket #45-1185

Chapter 4 - Schlumberger GPR Index Cover & GPR Install Landis+Gyr
56 98-1135 Rev AE Installation Guide
GPR Direction
If at all possible, the GPR must face away from nearby walls and should be installed in a location
unobstructed by gas pipes. Refer to "Schlumberger Changing GPR Orientation" on page -58 for
instructions. Refer to Appendix A GPR Waterproofing for waterproofing guidelines before attaching
connectors. Photos are for reference only: GPR cover and battery should not be connected until
Chapter 6.
GPR Mounting
NOTE: The Schlumberger/Actaris GPR index cover comes with a silicone gasket. The installer is not
required to install a separate gasket.
A CAUTION: Check the index cover switch cable assembly for nicks, abrasions, or any damage
prior to installing the assembly onto the meter.
1. Install the GPR cover assembly as shown in the following photographs. The Solid State Switch
must be located at the rear of the index.
2. Insert two 1/4x20x5/8 inch screws provided in the parts kit into the index cover front screw
holes. Turn the screws clockwise until they begin to thread into the index cover mounting holes.
Do not tighten the screws.
3. Insert the GPR Bracket into the index cover rear tamper cup slot as shown below.
U WARNING: Take care not to pinch the index cover switch cable assembly in any way,
especially during the following installation steps:
During index cover and cable assembly installation onto the meter.
During GPR enclosure cover installation.
Between the GPR and meter brackets and meter.
Figure 4 - 16. Slide Bracket into Index Cover Tamper Cup Slot
4. Insert two 1/4x20x5/8 inch screws into the index cover rear screw holes. Tighten all index cover
screws to between 15 to 20 inch-pounds.
5. The cable may be routed above or below the mounting bracket as shown in the following photos.
Use the routing method that provides the best security and protection to the cable.