User Manual
Table Of Contents
- 15-0160 - Exhibit Cover.pdf
- Perthshire Installation Manual 98-1135.pdf
- Chapter 1: Pre-Installation 7
- Chapter 2: American GPR Index Cover & GPR Install 23
- Chapter 3: Rockwell GPR Index Cover & GPR Install 39
- Chapter 4: Schlumberger GPR Index Cover & GPR Install 49
- Chapter 5: Sprague GPR Index Cover & GPR Install 61
- Chapter 6: Index Cover Pulser Install and Operation Start Up 77
- Chapter 7: Electronic Pulser Installation 83
- Appendix A: GPR Waterproofing 99
- Appendix B: Installation in Hazardous Locations 107
- Appendix C: American Kit Sub-Assemblies 111
- Appendix D: Rockwell Kit Sub-Assemblies 115
- Appendix E: Schlumberger Kit Sub-Assemblies 117
- Appendix F: Sprague Kit Sub-Assemblies 119
- Table 1-1. Typical Gas Meter Module Installation Tool List
- Table 1-2. American Meter Index Cover Mini Switch Kits
- Table 1-3. American Large Diaphragm Meter Dial Wheels
- Table 1-4. American GPR + Brackets Kits
- Table 1-5. Rockwell Large Diaphragm Meter GPR Index Cover Kit
- Table 1-6. Rockwell Large Diaphragm Meter GPR Dial Wheel
- Table 1-7. Rockwell Mounting Kit
- Table 1-8. Schlumberger Large Diaphragm Meter GPR Index Cover Kit
- Table 1-9. Schlumberger Large Diaphragm Meter GPR Back Mount Wheel
- Table 1-10. Schlumberger Mounting Kit
- Table 1-11. Sprague Large Diaphragm Meter GPR Kit
- Table 1-12. GPR Dial Wheels
- Table 1-13. Sprague Mounting Kit
- Table 1-14. Rotary Gas Meter Module Installation Tool List
- Table 1-15. GPR Rotary Meter Cables
- Table 1-16. GPR Installation Components for Rotary Gas Meters
- Table 1-17. GPR Pipe Mounting Hardware.
- Table 6 - 1. Single Form-C Volume Wiring Definitions
- Table 7 - 1. Definitions
- Table 7 - 2. Single Form-A Volume Input Definitions
- Table 7 - 3. Two Form-A Volume Inputs Wiring Definitions
- Table 7 - 4. Two Form-A and Alarm Wiring Definitions
- Table B - 1. Conforming Safety Parameters
- Table C - 1. Kit, GPR Installation, American Large Diaphragm, Alternative Orientation #45- 1189
- Table C - 2. Kit, GPR Installation, American Large Diaphragm, Behind Index #45-1190
- Table C - 3. Kit, American Large Diaphragm Alternative Orientation GPR, #45-1193
- Table C - 4. Hardware Kit, American Large Diaphragm #45-1203
- Table C - 5. GPR Assembly w/ Universal Bracket #45-1185
- Table C - 6. GPR Cover Mounting Kit #45-1042
- Table D - 1. GPR Installation Kit for Rockwell 750 Large Diaphragm Meter #45-1186
- Table D - 2. Kit, Rockwell Large Diaphragm Index Cover Hardware #45-1169
- Table D - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table E - 1. Schlumberger Large Diaphragm GPR Kit #45-1187
- Table E - 2. Kit, Schlumberger Large Diaphragm Index Cover Hardware # 45-1171
- Table E - 3. GPR Assembly w/ Universal Bracket #45-1185
- Table F - 1. GPR Installation Kit for Sprague Large Diaphragm Meters #45-1188
- Table F - 2. Sprague Large Diaphragm Index Cover Hardware Kit #45-1114
- Table F - 3. GPR Assembly w/ Universal Bracket #45-1185

Landis+Gyr Chapter 2 - American GPR Index Cover & GPR Install
Installation Guide 98-1135 Rev AE 25
Figure 2 - 5. Cover Gasket and Base Plate with Optional Tamper Cup & Seal
Figure 2 - 6. Commercial Module Cover Removed
4. Swipe each end of the module with an RF Buster or magnet to force the module to save meter
data to non-volatile memory. Remove the Commercial Gas Module tamper seals, screws, and
cover. Disconnect the battery.
5. The Commercial Gas Module must be disassociated from the meter.
6. Disconnect the module from the programming device. Leave the battery disconnected, replace
the module cover, and return the module to the Landis+Gyr cross-dock.
American Mini Switch Kit Installation
Meter Preparation
1. Remove the tamper seals and screws from the index cover as shown in the following photos.
Cover Tamper Seal
Location
Serial/Power
Connector