User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Landis+Gyr Chapter 3 - Using Endpoint Testing Manager (ETM)
User Guide 98-1671 Rev AA 65
Figure 3 - 32. Demand Reset Status: Success
Simultaneously, a Demand Reset report will display. This report is similar to the Demand Reset
Data/TOU report output, except that it shows the status of the Demand Reset operation as
highlighted below. The Demand Reset report also lists the previous number of demand resets
reported by the meter. A portion of that report is shown below.
Figure 3 - 33. Demand Reset Report
The Demand Reset Report’s File menu offers options to Print a hard copy or to Save the report in
XML or HTML formats, along with a Page Setup choice.
Demand Reset Restriction
A Demand Reset Action may only be performed once every 24 hours.
Command Scheduler Tab
The Command Scheduler tab, as shown in Figure 3 - 34, is comprised of the Event Mask, Command
Schedule, and Activity Log fields.
A CAUTION: When an endpoint is hosted by Command Center, all schedules are managed by
Command Center. Endpoint Testing Manager should not be used to make changes to this
command schedule.