User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Landis+Gyr Chapter 2 - Command Center Deployment/Configuration
User Guide 98-1671 Rev AA 29
Figure 2 - 19. Configuration Group Window
2. Click the Add Meters icon for the Configuration Group to which you want to add meters in
order to display the Add Meters to Group window.
Figure 2 - 20. Add Meters to Group Window
3. Click the Meter(s) radio button and enter individual meter numbers separated by spaces,
commas, or semi-colons.
...or...
4. Click the Meter File radio button and then the Browse button to browse for a .csv file
containing all the necessary meter numbers.
5. Click the Add button and then the Exit button to save the additions.
After clicking the Add button, the user will receive feedback on how many meter numbers were
successfully and/or unsuccessfully added. The reason for an unsuccessful message is that the
meter number does not exist.
NOTE: If a meter is already in a configuration group, the meter will be removed from the original and
added to the new configuration group.
HAN Setup Process Overview
Pre-requisite:
• Meters must be ZigBee-enabled and in Normal status before any of the following HAN
functionality commands are usable.