User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Landis+Gyr Chapter 2 - Command Center Deployment/Configuration
User Guide 98-1671 Rev AA 27
Figure 2 - 15. Group Summary Window
The group membership list window displays the following categories:
• Status. Status is the current status of the meter.
•Total Meters. Displays the total number of meters in each status.
B. Click any of the meter number links to view the Endpoint Properties window for the
selected meter.
2. In the Configuration Groups window click the New button to display the Configuration Group
Properties window.
Figure 2 - 16. Configuration Group Properties Window
3. Enter a Group Name. The name must be unique within the organization.
4. Enter any desired Group Notes.
5. To set up Scheduled Commands use the following steps:
A. Select the desired packet definition from the Command drop-down.
B. Select the Time at which the reading will be taken from the meter. Adjust the time by
clicking on either the hours, minutes, or AM/PM and then using the up or down arrow.
C. Select the Frequency with which the reading will be taken from the meter.
If either Every n minutes or Every n hours is selected, an additional field, N, will be
displayed.
Figure 2 - 17. Frequency Interval