User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Chapter 2 - Command Center Deployment/Configuration Landis+Gyr
20 98-1671 Rev AA User Guide
Tracking and Deployment
Deployment Status
Deployment Status enables users to monitor the find process when endpoints are being deployed on
a system.
1. Click Network > Deployment Status to display the Deployment Status Report screen.
Figure 2 - 5. RF Deployment Status Screen
2. Choose the Selection Criteria:
A. All
...or...
B. Collector. Select the desired collector from the drop-down menu.
3. Select a Date Range:
A. Start Date. Click the calendar icon, and then click on the desired start date.
B. End Date. Click the calendar icon and then click the desired end date.
4. Click the OK button to display the RF Deployment Status Report.
Figure 2 - 6. RF Deployment Status Report
The RF Deployment Status Report displays a graph representing 14 days of installation statistics and
a chart. Time periods longer than 14 days may be selected, but will not be presented on the graph due