User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Chapter 2 - Command Center Deployment/Configuration Landis+Gyr
18 98-1671 Rev AA User Guide
Figure 2 - 3. Import Installation File Screen
2. Enter the Path to the file.
...or...
3. Click the Browse button to navigate to, and select, a file containing the endpoint information.
4. Click OK to upload the file. The information imported via the Installation File:
Table 2 - 1. Installation File Fields
Data Format Format/Description
User ID* AlphaNum (30)
Login assigned by the utility for the installer. Utility may
elect to use “1” for System usage.
Installation Date*
Date
MM/DD/YYYY
12/26/2009
Actual date the meter was installed. This date is used in
various Command Center reports to track deployment
statistics.
Installation Time*
T i m e H H M M A M / P M
11:12 AM
Actual time the meter was installed. This date is used in
various Command Center Reports to track deployment
statistics.
Change Out meter
number
AlphaNum (20)
The meter being replaced with a new meter. Meter change
out information is displayed in the notes section of the
endpoint information screen.
Change Out meter
kWh
AlphaNum (20)
The kWh reading on the meter being replaced Meter
change out kWh information is displayed in the notes
section of the endpoint information screen. Variable
Character.
Installed Meter
Number*
AlphaNum (20)
Meter number of the new meter being installed. This meter
must exist in Command Center prior to importing the
Import Installation File. Must parse to Decimal format.
Installed Endpoint
Serial Number*
Decimal (9)
The serial number of the new meter being installed. Note:
Endpoint serial numbers must be converted from Hex to
Decimal.
Installed Meter kWh Decimal (9) Initial reading of the new meter.
Service Latitude Decimal (12,8) GPS latitude.
Service Longitude Decimal (12,8) GPS longitude.
Service Location AlphaNum (100) Meter service location.
* Indicates a required field.