User Manual
Table Of Contents
- 15-0028 - Exhibit Cover.pdf
- Elster A3 User Guide 98-1671.pdf
- Endpoint Overview
- Command Center Deployment/Configuration
- Deployment
- Tracking and Deployment
- Endpoint Configuration
- HAN Setup Process Overview
- HAN: Initialization
- Provisioning HAN Devices
- Remove HAN Devices
- Management and Troubleshooting
- Meter Swap Out Process using Decommission HAN
- Commission HAN Network for Channel Control
- Meter LCD Screen for ZigBee Alerts
- Confirm HAN Radio in Meter is Communicating or HAN is set-up
- Get information for a specific device
- Get Firmware version for the HAN radio
- Confirm that a HAN device can communicate with the meter
- Using Endpoint Testing Manager (ETM)
- Specifications
Landis+Gyr Chapter 2 - Command Center Deployment/Configuration
User Guide 98-1671 Rev AA 17
Figure 2 - 1. Import Meter Manufacturer Data
2. Click the Browse button to navigate to, and select, a file that was sent by the meter
manufacturer.
3. Click the Save button to import the file into the database.
The Meter Manufacturer Data Import (Upload Complete) window will appear displaying the Error
Summary (if applicable) and Successful Entries.
Figure 2 - 2. Upload Complete Window
NOTE: Any entries under Error Summary will be red text. The usual reason for an entry under Errors
is that the endpoint already exists in the system. If file parsing errors or other file-related errors
occur, contact the meter manufacturer that supplied the file.
4. Successful entries will be added to inventory and will be displayed on the dashboard as
Inventory status.
Import Installation File
Meter deployment details can be imported by use of an Installation File provided by the installer.
Following is the procedure for importing the installation file.
1. Click Operations > Import > Import Installation File to display the Import Installation File
screen.