User Manual

Table Of Contents
Chapter 1 - Pre-Installation Landis+Gyr
8 98-1135 Rev AA Installation Guide
understand that their supervisors responsibility does not relieve them from their individual
responsibility to perform the work safely and to follow all safety rules and procedures applicable to
their work.
Preliminary Checks
1. The installer will verify correct site, as specified on work order.
2. The installer will verify that the site is safe for installer activity and equipment.
3. The installer will notify the customer of installer presence and activity, telling the customer that
meter access is required. If necessary, the installer will have the customer sign the work order.
4. When installing meters, the installer will follow guidelines issued by the utility in addition to
those given in this guide.
5. The installer will never perform an installation during a lightning storm or under excessively wet
conditions.
Site Requirements
The site must comply with the following criteria:
1. There is no chance that another object will be set over the antenna.
2. Some instances may require additional cable.
Figure 1 - 1. Examples of some required tools
NOTE:
Table 1-1. Typical Gas Meter Module Installation Tool List
Torx Pin Head Driver, T10 Phillips Screwdriver, #2
Flat-tip Screwdriver, 3/16 inch x 4 inch Flat-tip Screwdriver, 1/4 inch x 5 inch
Phillips Screwdriver, #0, precision
Torque Driver / Wrench, 0.5 inch-
pounds to 20 foot-pounds
Torx Pin Head Driver, T15 5/16 Combination Wrench
Wire Brush Awl, Heavy duty
Scraper, Brass, 1.25 inch wide