User Manual
Landis+Gyr
Appendix C - Bench Testing
Network Concentrator User and Installation Guide 98-1013 Rev AF 100
Testing Concentrators
The steps involved in the test process are explained below.
1. Configuration.
Configure the concentrators in the test bench 24 hours before starting the test.
2. Verification.
Perform the actual test verification procedure at least 24 hours (up to 48 hours) prior to the
deployment.
3. Reconfiguration.
Before the final deployment, reconfigure concentrators for the utility Network ID. Modify the
default destination address to one of the utility TOPs.
Configuration
Both the Console/LAN Packet Protocol cable (PN 19-1126) and the Network Configuration
Manager application are required to configure the WAN radio in the concentrator. The test Network
ID and the Default Destination address of the test TOP are highlighted in Figure C.2.
Figure
C.2
Sample Network Configuration Manager Settings
for Concentrators
Verification
To verify the operational condition of the concentrator:
1. Connect the Console port DB9 connector of the Console/LAN Packet Protocol cable (PN 19-
1126) to the COM port of a laptop or a PC.
2. Configure the port for the following:
• 9600 baud
• 8 bits