User Manual
Table Of Contents
- 10-0097 - Manual Cover.pdf
- Concentrator Manual 98-1031-1
- Table of Contents
- Preface
- Pre-Installation
- Field Configuration
- Concentrator Installation
- RF Filter Enable/Disable and Battery Replacement Kit
- Performing System Upgrades
- Troubleshooting
- Product Specifications
- Compliance
- Bench Testing
- About Firmware
- About Programming and Diagnostic Cables
- Sample Survey Sheet
- Power Cable Installation
- Glossary
- Index
E
Series IV Concentrator U and I Guide 98-1031 Rev AA 97
About Programming and
Diagnostic Cables
Landis+Gyr offers multiple cable options for performing system upgrades and configuration. The
following table outlines tasks each cable can perform.
Table E-1. Update Cables
Cable LPP Console Ethernet
19-1185
Upload DCWs,
Upload new
firmware, and
configure the
Gridstream radio
inside the
concentrator.
Configure EEPROM
settings in the
concentrator CPU,
which includes the
Concentrator Net and
Node ID (aka MCC
Net and Node), Event
Manager Net, and
Node settings.
Can do a direct FTP
download of
concentrator CPU
firmware via cable
connection. Use a
router, computer, and
Ethernet cables.
19-1126
Upload DCWs,
Upload new
firmware, and
configure the
Gridstream radio
inside the
concentrator.
Configure EEPROM
settings in the
concentrator CPU,
which includes the
Concentrator Net and
Node ID (aka MCC
Net and Node), Event
Manager Net, and
Node settings.
No Ethernet
connectivity. Perform
upgrades over the air.
You must have a WAN
network setup with a
Take Out Point (TOP),
and the Cellnet
system running on the
system controller.