2.1 Contractor-provided tools
The following table contains specific tools required for the installation of Concentrators on the four
primary installation types. The contractor shall also provide typical tools required for mechanical
and electrical installations such as normal lineman tools, wire cutters, hammer, assorted screw
drivers, socket set, wrenches, voltmeter, compass, tape measure, etc.
Tools Provided by Contractor Wood Utility
Pole
Steel Street
Light Pole
Building &
Structure Install
Pad-mount XFMR
steel banding tool
X X
drill (battery, gas or electric
powered)
X X X
drill bits for lag and D/A bolt
X X X
Laptop computer with serial
port*
X X X X
* May not be required. Refer to statement of work or work project request.
2.2 Contractor-provided material
The following table contains specific material required for the installation of MCCs on the
four primary installation types. Note: additional material such as screws, nuts, bolts may be
required to complete installations. The contractor shall provide this material for each
installation.
Material Provided by
Contractor
Wood Utility
Pole
Steel Street
Light Pole
Building & Structure
Install
Pad-mount
XFMR
TBD
3.0 Customer Notification/Authorization
3.1 Appointment for building access
The Below statement is a placeholder until statement can be reviewed.
Cellnet shall provide a point of contact for each building that needs access by the contractor. It
shall be the contractor’s responsibility to schedule the required appointments and to make
notifications to the appropriate building owners, managers or tenants before performing the
Concentrator installation.