Installation instructions : Wal titillation 1a according to the descend drawings determine the installation position of mall Zo the baser wall Lang into theoretical, with a pencil painting hole position 30 according to the base swatting holes with a hammer in the wall drilling. In Premieres coir dig 4 lay & good place in the expansion pipe; used for fixing screws, 5.