System Installation continued…
Plumb the return lines from the collection vessels to a point on the take-out end of the fryer at a position
above the oil level line in the fryer.
Important: Each collection vessel must have its own return line to the fryer.
Plumb the drain lines to the shut-off valves provided. Refer to LAKOS system drawing in this section.
Plumb the air supply lines to the ¼” ball valves provided for blow-down.
Warning: Air supply must be provided with a pressure regulator and filter.
Pressure gauges should be installed on the inlet and outlet of the separator. The gauges will be used to
verify separator performance (supplied by customer).
Tag Valves with following numbers. Refer to LAKOS system drawing.
1. Bypass valve 9. Blow-down valve
2. Bypass valve 10. Blow-down valve
3. Bypass valve 11. Drain valve
4. Throttling valve 12. Drain valve
5. Throttling valve 13. Hand valve
6. 3-Way directional valve 14. Hand valve
7. Isolation valves 15. Hand valve
8. Isolation valves 16. Hand valve
Tagged valve will correspond with operation procedures