User's Manual

Table Of Contents
TiWi-SL MODULE
DATASHEET
The information in this document is subject to change without notice.
Confirm the data is current by downloading the latest revision from www.lsr.com.
330-0085-R0.4 Copyright © 2011 LS Research, LLC Page 15 of 36
DEVICE POWER-UP AND ENABLE
Normal operation mode requirements:
1. The MODE1 and MODE2 signals need to be shorted together.
The following sequence describes the device power-up from shutdown. See
Figure 3 and Table 10 for timing
details.
Normal operation power-up requirements:
1. Apply power to the module through the VCC input.
2. Wait for the internal 32kHz clock to start-up and stabilize (t1).
3. Enable the module through the PWR_EN input.
4. Wait for the module to start-up and be ready (t2).
Figure 3: Device Power-Up Timing
Timing Parameter
Symbol
Max
Unit
VCC to PWR_EN
t1
???
msec
PWR_EN to Device Ready
t2
???
Msec
Table 10: Device Power-Up Timing