Owner's Manual
Table Of Contents
- 1 Introduction
- 2 Quick Start
- 2.1 Setting Up the Equipment
- 2.2 Gathering Supplies and Equipment
- 2.3 Preparing the Urocap NXT
- 2.4 Preparing the NXT Go Pump Hub
- 2.5 Preparing the Roam NXT
- 2.6 Preparing the UPP Puller NXT (Optional)
- 2.7 Setting Up Consumables and Preparing the Patient
- 3 How to Perform a Study
- 4 Synergy Software
- 5 Maintenance and Service
- 5.1 Cleaning and Disinfection
- 5.2 Preventive Maintenance
- 5.3 Verifying Calibration
- 5.4 Configuration
- 5.5 Computer Virus Protection
- 5.6 Disposing of Product After Use
- 5.7 Environmental Consideration of Waste Disposal
- 5.8 Backups
- 5.9 Troubleshooting Guide
- 6 Hardware
- 7 Appendix

Synergy Software
NXT Go Owner’s Manual, LBL-00145, MAN2030 72
4.6.1.2 Protocol Guidance
During the Recording phases of the Procedure workflow step, the Quality Control window
will display Protocol Guidance. Two protocol fields are provided: Total Score and Phase
Score (Figure 61). The Quality Control icon will shift colors as the phase score evaluation
changes. The Protocol Scores are color coded in accordance with QC Score values. Green
signifies an excellent score, Amber a good score, and blue a fair score.
Figure 61: Protocol Guidance - Total Score and Phase Score
Refer to QC Score and QC Score Summary on page 73 for an overview of how QC score is
calculated.
4.6.1.3 UDS Intelligence in the Review Workflow Step
Compiled features of UDS Intelligence can be referenced in the Review workflowstep.
Select the Quality Control Icon from the Slide Sidebar. From this window the Protocol
Guidance, Pre-test Quality Control, and QC Score can be reviewed for each phase of
the study such as flow, Filling, and Voiding. Navigate the window by selecting the tab
corresponding with the phase requiring review (Figure 62).
Figure 62: Protocol Guidance and QC Score in the Review Phase
Status DRAFT Effective