Owner manual

8
Product Service 1-800-522-7658
Chapter 2: Prerequisites
by a qualified electrician. Refer to Chapter 3: Getting Started and
Appendix C: Protector XStream Specifications for the wiring
diagram for proper electrical installation.
Service Line Requirements
All service lines to the laboratory fume hood should be ΒΌ inch
outside diameter, copper (brass for natural gas), and equipped with
an easily accessible shut-off valve, should disconnection be
required. If the service line pressure exceeds 40 PSI, it must be
equipped with a pressure regulator to reduce the line pressure.
Please check with local codes for other requirements.
Space Requirements
The dimensions for the different models are shown in Appendix B:
Protector XStream Dimensions.