Instruction Manual

Product Service 1-800-522-7658
11
C
C
h
h
a
a
p
p
t
t
e
e
r
r
3
3
:
:
G
G
e
e
t
t
t
t
i
i
n
n
g
g
S
S
t
t
a
a
r
r
t
t
e
e
d
d
Once the site for your glove box is properly prepared, you are ready to
unpack, inspect, install, and validate performance of your system. Read this
chapter to learn how to:
Unpack and move the glove box.
Set up the glove box with the proper supporting structure and work
surface.
Add the oil and if required connect an exhaust system to the pressure
relief bubbler.
Install the gloves.
Connect the electrical supply.
Connect the plumbing lines for gas, vacuum, and gas purifiers or
drying trains.
Validate performance of the glove box.
Each Protector Glove Box model weighs as follows:
Fiberglass, 350 lbs/157 kg.
Stainless, 500 lbs/225 kg.
Stainless Doublewide, 1000 lbs/450 kg.
The shipping container allows for lifting with a mechanical
lift truck or floor jack. If you must lift the glove box
manually, follow safe-lifting guidelines. Do not lift by the
upper sheet metal façade and front panel as damage can
occur to the glove box liner.
!