Now that the installation is properly prepared, you are ready to inspect,
install, and certify the Purifier Biosafety Cabinet. This chapter covers how to:
Unpack and move the Biosafety Cabinet.
Install the cabinet.
Connect the electrical supply source.
Connect the service lines.
Connect to an exhaust system (optional).
Arrange certification of the Biosafety Cabinet.
Tools required for installation the Biosafety Cabinet include two 1/2"
wrenches, a flat-blade screwdriver, a #2 Phillips screwdriver, and a
carpenter’s level.
Note: The Biosafety Cabinet models weigh between 400–700 lbs. (182-318
kg). The shipping pallet allows for lifting with a mechanical lift truck or
floor jack. If you must lift the product manually, use at least six (6) persons
and follow safe-lifting guidelines.
Note: The side panels must be removed to access the fasteners that secure the
Biosafety Cabinet to the pallet. DO NOT ATTEMPT TO LIFT THE
BIOSAFETY CABINET BY THE SIDE PANELS; DAMAGE WILL
OCCUR.