Lake Controller Operation Manual Version 1.7.0
268  
Lake Controller Operation Manual Rev 1.7.0
Lake-enabled Amplifier Reference
20.9.4  Verify
After all required cable data is entered, tap VERIFY to initiate LoadSmart verication. Tap YES to conrm. 
Load verication commences for all power output channels assigned to the selected Module. The channels 
are muted and a sequenced sweep is issued. After the verication procedure has been conducted, the 
LOAD RESULTS window appears.
Simultaneous load verication of all Lake-enable ampliers on the network can be initiated from the 
GLOBAL CONTROL tab. Please refer to section 20.9.
LoadSmart verication can be initiated from the 
PLM and PLM+ front panel, with a reduced set of 
results displayed on the front-panel LCD. Refer to 
the relevant Operation Manual for further info.
Figure 20-9: Load Verication  Results
20.9.5  Settings
The set of buttons at the foot of the page allow the user to select the most convenient measurement units 
for the load verication system and cable resistance calculation. The options are:
 ▸ TEMPERATURE – °C or °F
 ▸ CABLE LENGTH – Meters or Feet
 ▸ CABLE GAUGE – AWG numbers or as mm2 cross-section










