Install Instructions

LAARS Heating Systems
Page 58
9.1 Quick View
Before Installing
- Make sure that there is enough space for installing
Water and gas line.
Verify vent/air termination is located as required.
- All models need for propane Conversion which
requires a separate gas conversion manual.
Install Water Piping
- Water Heater loop piping must be sized to the
minimums listed in the Water Heater manual. Using
smaller piping will cause performance problems.
(Page 32)
Install Vent & Air Piping
- Slide the air inlet pipe and vent pipe into the Water
Heater pipe connector.
- Make sure the terminations are placed as required
in the manual and that air intakes are at least 12
inches above normal snow line.
- Refer to the material check list in this guide for a
list of items needed.
Install Condensate Piping / Tubing &
Components
- Fill out the material check list in this guide to
ensure you have the tubing or PVC pipe and all
components needed for the condensate piping.
- Connect internal components that are supplied
with the Water Heater.
Install Gas Piping
- Install a union and shutoff valve.
Wire the Water Heater
- Connect power wiring and control wiring per water
heater manual wiring diagram.(Section 5.17)
Start up, Adjust & Test
- Follow the Water Heater manual instructions to
clean the system if needed, then ll and check
water chemistry.
9.2 Final check lists
Final check : Installation Conditions.
Is the Water Heater properly mounted on the wall?
Is there space for a drain which is close to the
Water Heater?
Are there any combustible materials near the
Water Heater and vent pipe?
Is the air supply sufcient for proper operation of
the Water Heater?
Are the proper service clearances maintained?
Is the distance between the Water Heater and
point of vent termination minimized?
Is the proper distance from windows, doors, and
other intake vents maintained?
Final check : Gas pipe installation
Is the gas supply line equipped with a manual shut
off valve?
Is the gas supply line a minimum of 3/4˝ inner
diameter?
Is the gas supply line length and diameter
adequacy to deliver the required BTU’s?
Has the gas supply line pressure been measured?
Does the supply gas type match the type indicated
on the water heater rating plate?
Final check: Air/Vent pipe installation
Has the Water Heater been vented with or 2”
PVC, CPVC, Polypropylene or BH Special
Gas Vent (S636 PVC, CPVC) for Category IV
appliances in accordance with this manual and/or
your local code?
Is the vent termination at least 12˝ above the
exterior grade?
Is the total vent length within the maximum vent
length restriction?
Have you checked the air/vent piping for leaks?
Have you properly supported the vent termination?
Are all vent runs properly supported?
Is the vent sloped upward toward the vent
termination at a rate of 1/4˝ per foot (2% grade)?
Final check : Condensate drain installation
Have you installed a condensate drain line from
the Water Heater to a drain or laundry tub?
Final check : Setting the DIP switches
Are all DIP switches correctly set on the main board?
Section 9 Installation Check