Install Instructions
Table Of Contents
- Cover
- TABLE OF CONTENTS
- SECTION 1 GENERAL INFORMATION
- SECTION 2 LOCATING THE BOILER
- SECTION 3 AIR AND VENTING
- SECTION 4 GAS CONNECTIONS
- SECTION 5 PUMP REQUIREMENTS
- SECTION 6 WATERCONNECTIONS
- SECTION 7 ELECTRICAL AND WIRING DIAGRAMS
- SECTION 8 THE DIGITAL DASHBOARD
- SECTION 9 INITIAL STARTUP
- SECTION 10 MAINTENANCE
- SECTION 11 OPERATING DETAILS AND TROUBLESHOOTING
- SECTION 12 REPLACEMENT PARTS
Page 41
10.A.4 Draft Hood Removal
First remove the vent pipe. Keep all parts
organized for reassembly.
Pull both bottom anges outward approximately
an inch. This frees the latching anges which
then allow the bottom to be pulled away from
the boiler. With the hood at a slight angle, slid
backward and upward freeing the top ange from
the jacket.
Reverse the process to reinstall.
10.A.3 Side Panel Removal
Remove the front access and the top as
described previously. Drain the boiler and
remove the drain valve and/or the PRV and
associated ttings depending on the panel being
removed. Then pull upward and inward slightly
at the top inside anges. These are spring type
latches which will release as force is applied
upward.
Reinstall by placing the panel at a slight angle to
line up the bottom ange, tip it in until straight up,
then push down until the upper spring catches.
Figure 38. Side Panels and Draft Hood
Removal
MINI-THERM JX Residential Boilers
®










