Installation Guide

LTV-R1 Rain Sensor
Lets identify the parts of the rain sensor.
Base
Funnel
Release Tabs
Funnel
Rocker
Battery
Release Tabs
An extra piece of plastic used for repositioning the battery
compartment correctly. After batteries are installed, make
sure this alignment tab is facing the front of the Base to
lock all four Battery Release Tabs back into place.
Quick Startup Instructions
1. Insert 2 AA batteries into the rain sensor. Observe correct polarity.
Remove the Twist Tie securing the rocker for shipment.
2. Insert 2 AA batteries into the rain station. Observe correct polarity.
3. Optional: Tip the rocker of the rain sensor to simulate rain and
receive a reading on the rain station.
4. Leave 5-10 feet apart for 15 minutes. After 15 minutes, with station
and sensor connected, move the rain sensor outside to an open
area. (Position Rain Sensor-- Page 13)
5. Use Setting to program the rain station.
Alignment Tab
Page | 3 www.lacrossetechnology.com/support/ 724-2310
Important: Remove
the twist tie from
below the rocker. The
twist tie secured the
rocker for shipment