Installation & User Guide
Table Of Contents
- 1. Important safety information
 - 2. Range overview
 - 3. Cooking tips
 - 4. Cooking table
 - 5. Cleaning your range
 - 6. Troubleshooting
 - 7. Installation Instructions
 - 8. Service and parts
 - 9. Installation safety instructions
 - 10. Installation
 - 11. Gas connection
 - 12. Conversion to LP Gas
 - 13. Electrical connection
 - 14. Final fitting and checks
 - 15. Circuit diagram
 - 16. Technical data
 - 17. Warranty
 
INSTALLATION 
Check the appliance is electrically safe and gas sound when you have nished.
28
ArtNo.280-0070 - Side extension A
ArtNo.280-0071 - Side extension B
ArtNo.281-0004 - 90SC
- Fitting the side panel
ArtNo.281-0005 - Albertine SC
- Side panel in place
Side panel extension kit
Two side extension panels are supplied with the range. These 
can be installed where the side of the range is exposed. The 
extension installation must be performed by a qualied gas 
installer, preferably during installation of the appliance 
(Fig. 10.13). 
Kit Contents:
•  2x Side panel extension
•  4x M5 screw 
•  4x M5 nut 
•  4x Large washer 
•  4x Shake-proof washer 
Procedure
1.  Place a screw and washer in the top hole in the rear 
edge of the range side panel. Add a shake-proof washer 
and start the nut on the screw threads so that the screw 
is loosely held in place. Repeat with the other hole 
(Fig. 10.14). 
2.  Slide the side extension in from the side behind the 
washers (Fig. 10.15). 
3.  Tighten the top and bottom screws to hold the side 
extension in place. 
Reposition the range making sure the anti-tip device is re-
engaged properly when the range is replaced. Failure to take 
this precaution could result in tipping of the range and cause 
injury. 
NOTE: Check that the extension panel does not foul the 
mains lead or gas connection when the cooker is pushed 
back. Reconnect the electricity supply. 
Fig. 10.13 
Fig. 10.14 
Fig. 10.15 










